This is an advertisementInterested In Advertising? | Contact Us Here
15-20 mins max,on a regular clean that includes being packed up and driving off,but only if there out gotta use your loaf.Regardless of the good quality finish if your to quick and there in look out.
If it is a small 3 bed semi with 3 windows and a door on the front, one side window and 3 windows and a door on the back then 10 minutes would easily do you. That is as long as you had the right set-up, van-microbore-light pole.4 or 6 weeks does not make too much difference in time, unless there has been very bad weather.The biggest factor affecting your clean time is actually your set-up time and access. I have seen some WFP'ers who take so long getting their equipment out of the vehicle etc that the cleaning house takes less time. It should be park up-get your reel out the vehicle and facing the right way. Lift your pole off the roof and connect up. Walk round the house to the farthest point turn on your valve and start work. Total set-up time 30-60 seconds MAX.
If it is a small 3 bed semi with 3 windows and a door on the front, one side window and 3 windows and a door on the back then 10 minutes would easily do you. That is as long as you had the right set-up, van-microbore-light pole.4 or 6 weeks does not make too much difference in time, unless there has been very bad weather.The biggest factor affecting your clean time is actually your set-up time and access. I have seen some WFP'ers who take so long getting their equipment out of the vehicle etc that cleaning the house takes less time. It should be - park up, get your reel out the vehicle facing the right way, lift your pole off the roof and connect up. Walk round the house to the farthest point turn on your valve and start work. Total set-up time 30-60 seconds MAX.