I have already done most of it.
Just the inside of tennis court fence, and 95% of the court left to do
Drainage wasnt such a big issue beacuase its been hot, and there was plenty of run off area, and one huge sump.
Tennis court has been started with the FSC. I will clean up with the turbo, problem with using the turbo on the tennis court is consistency.
You cant get too close to it because it will blow holes in the surface, or blow the paint away, and its really hard to keep a constant distance from the surface.
Im cleaning it up with a yard scoop, there is so much moss its quicker than moving it around with the turbo.
Wont need much re sanding if any, its not normally block work, its all set in place with pug, I may run some sand back down it just to make sure, but the other block work that they have just had done, isn't sanded so ill see how time goes.
Ive spent 21 hours so far, forgot to mention the gates.
I didnt need to give a price, because they just said do it, and that they trust me. With almost any other client this would be a problem, but this client is as good as gold.
I just dont want to over charge them.