Hi,
If any manufactures are reading this, please could you give the option to have the following fitted to every solution line....
A gate valve (Stop Cock) to be braided into the solution line, Ideally situated behind every female connector, this would make the task of releasing connection couplings much easier and would also eliminate the ominous task of running back and forth to the machine to stop and start the pump in order to change tool attachments.
Heres a typical example...cleaned a landing carpet and staircase today using a Ninja and Steamate (Heat exchanger), I rapped the end part of the first 25 ft length of vac pipe around the bannister legs at top of stair case to prevent the hose sliding back down when cleaning the landing, then connected the second 25 ft length to the succoured first section.
When I had finished cleaning the landing I needed to disconnect the two lengths that were rapped round the banister legs to enable me to clean the staircase so ran downstairs and switched off the pump then ran back, but was still unable to disconnect due to pressure build up in the exchanger, ran back to machine and tried like mad to release the male connector from the exchanger after 10 mins of choice language the connector flew out at about 15 000 mph along with a jet of red hot steam, then released the pressure from the pipe by pressing the nipple on the end of the male connector.
The connections could then be released.
So come on manufactures, us CC want on/off valves braided onto solution lines behind every female connector.
Cheers
Pete