This is an advertisementInterested In Advertising? | Contact Us Here
Should be about 10 mins work if your guys are as fast as Nathan. I'd say £12.50 for the lot.
ide say £200 per block is a fair price
Thanks fellas, thats a big help.@ Daz, are you saying £440 per block m8, so £880 in total ?So general concensus is around the £800-£1000ish over a two day period for one man. I was breaking it down like Ian said and got it to around a £1000, so not too far out. Thanks for all the advice, a big help.Fieldsy
how long do you think theyll take?id have no idea either!one building a day?2 days work?id go in at £440 and hope id get each building cleaned in 5-6 hours.