Ive been wf for just over a yr now and ive shed loads of time, dispite picking new work up as well.
My work is four weekly, on trad it used to be pretty full each wk, but now i have one full week of work. My other three rounds im getting finished by end of wed. Do most wks getting 2 days off (filling with pressure washing now or render cleans)
For me, its a good carbon pole. 4 jets on a brush with a tap valve at end of pole hose. I have a 500 litre tank in van and pure freedom controller for pump n battery reading. I have my pump on 40 and on maintenance cleans which my work is, it takes no time at all. Basically cleaning clean windows