This is an advertisementInterested In Advertising? | Contact Us Here
wouldnt you just use a portable system??
when we have done schools in the past we had to link hosereels together but they were normal garden hose in the days before microbore etc i dont recall any problems to be honest maybe a little drop due to connections
one way to solve the pressure problem is to have a larger dia hose for the first 100m then reduce it down to a smaller dia hose for the next 100mlike:- 8mm hose down to 6mm hose. this is what we do in house plumbing for water and gas to keep pressures to the max!
Quote from: R.C Property on January 31, 2013, 12:40:38 pmone way to solve the pressure problem is to have a larger dia hose for the first 100m then reduce it down to a smaller dia hose for the next 100mlike:- 8mm hose down to 6mm hose. this is what we do in house plumbing for water and gas to keep pressures to the max! brilliant suggestion. Can see that would work. Excellent!
We clean schools and colleges all over the place and often connect 300-400 metres of microbore - with NO pressure problems whatsoever with our 100PSI pumps.We use WFP up to 20 metres without a loss in flow rate.