I've got two lots of 25ft and went to quote a job this afternoon and its a 3 story house and yep they want landing and bathroom on top floor done. Got the job but I'm thinking I might need more than the 50ft available to me, or I'll be hauling my Airflex up to the first floor.
Alternative solution would be a lightweight portable for the work above 2nd floor level.
I would defo get some more, at LEAST another 25', and then another 25 later.Dont know how you managed lugging a machine upstairs..If you get a 50' piece, cut it and make a 35' and a 15' (you need two more cuffs and 2 joiners of course).Then you have 15', 25', 35', 40', 50', and 75'. Never too much spare hose for you to trip over.