Mate because i said i would chip in and help the builders too my landlord,think they took the pee,I re wired all the lighting,swapped switches,removed junction boxes,knocked out the fire place,insulated and boarded out the loft,removed all the old ceiling,just been out and put the tarp over the roof,as it`s just been rendered,they left it all uncovered,got my work cut out !!
The ceiling used to be level with the top of the door,and the kitchen units,was constantly ducking,to avoid the strip light !!
All the space above it was just dead,and un used