5 mins...lol....
due to the scepticism shown towards my 5 minute estimate i am wondering if i am being too optimistic??
But i don't think so. Although i haven't done a time and motion study on a front only.
I have a similar looking job and i will just pull the hose to the front and time myself.
I don't know what else to say? I use a 17ft xtel pole, between 1 and 1/12 lpm flow rate. I don't rinse off the glass, i rinse on. I also give a quick brush over the frames. I'm fit enough to reel my hose in quickly without mechanical aid.
My 5 minutes
is based on the customer not being home and i post a chit to send me a cheque.
I have a cup of tea in the morning and don't stop for a break until i get the days scheduled work finished and i then go home. And have the 2nd cup.
This is also on maintenance cleans. 1st cleans i take however long it takes to be thorough and i will go back at the end of the day to check that they are spotless.
After the jobs come up good the 1st time i don't hang around on future cleans.
But the little seed of doubt has been planted in my mind. Maybe i ain't as quick as i think?
But i will check.