This is an advertisementInterested In Advertising? | Contact Us Here
bobby i was always told that you would probaly go though about 10 people before you find the right one.
the one thing i learned is that i definitely like having a helper along with me. i did the ladderwork while my helper did the low . the low includes door bits so in effect i got the best option doing the ups and we were Zapping through the work WHEN he was with me. trouble was on the days he didnt show i was faced with a mountain of work i was paying him £8 per hour +his bus fare . im near Ipswich . somewhere on this forum i once read of a scheme where you can take on a lad and its subsidized by the govt for a few months. im thinking i could ring up the local job centre and find out if such exists