Hi all.
I produce my pure 15 meter’s away from the van and pump it to the van via a 19mm rubber heater hose. 350 tank in van takes 15 minutes to fill. 13mm hose used to take over 40 minutes but would sit nicely out of the way on a reel.
The 19mm I could coil up by hand and put it out of the way/sight.
However the cold weather is now preventing this as it’s become non compliant 😁
Really don’t want to go back to 13mm and wondered what you use.
Thanks in advance