well gave the baby 1st run today on 3 paying jobs , left the ninja at home so it was all or nothing

1st house two large rugs and runners , after fighting with the hoses to get them in the house all went well only problem was found i was a bit of a wimp trying to keep pressing the hand tool at 400 psi - ist lesson learnt drop the psi lol when on hand tool
2nd job - h.s.l and bedroom - went ok found a knack to tame the hoses better

3rd job lounge and kitchen , could park right outside the door so in true sas style i run into the front room with pre spray and hose in hand then back out to fire up and get wand - cleaned a treat hot steam everywhere ( not seen that on the ninja for years ! out the door all rolled up super quick .
well happy on the 3rd job - now i can see the time saving that comes with the TM
so after my first day on the TM , im shattered lol and think i my need to get down the gym to build up to running into houses with a 50 mtr hose under each arm
