afternoon tim, just been and had a look at the refurbished toilets. there are 5 toilets roughgly 3m x 5m and there are x2 shower rooms 8m x 3m. Both areas are tiled on the walls and have a vinal flooring. Both areas need a builders clean and a sparkel finish as the client is looking to use the facilities. what materials and chemicals do i need, how long roughly do you think it will take and how much should i charge.
regards
reece