gavin,
thanks for the input, bit of a learning curve for us on the generator, though, the amount of drying lkit that we have put on site so far, we have got a 30KVA multi phase generator on site, its HUGE, and , cables everywhere.
this place is drenched top to bottom.
a good challenge though.
we hope to get a temp board into the premises and the heating fired up next week.
regards
martin