Clean It Up
UK Window Cleaning Forum => Window Cleaning Forum => Topic started by: RO-Sheen on September 16, 2008, 05:40:34 pm
-
You guys helped me about a few weeks ago with pricing the building for window cleaning. I got that job and did it today so thank you very much everyone, but today they asked me to quote for cleaning the front of the building.
They want me to clean the white space between the first floor and ground floor windows, the white space under the ground floor windows and corrugated area at the far end of the building (Floor to top of 1st floor window)
Nothing at the sides or back of building, just the front.
How much? This will be a one off job
Thanks in advance
Adie
-
To be honest the white areas between and under the windows arent too bad. Just a bit of surface dust but the corrugated area has lots of cobwebs.
How do you it? On the corrugated area do you brush it with a dry brush first and then wfp?
-
Just out of interest what would you lads charge for the glass in that picture??
-
one off job 150 the lot.a hours work
-
The fascia clean something along the lines of £180 as already said, bit hard to see what they want exactly, if it was covered in algae I could understand it, just a sweep-off ??? ???
The glass 3 monthly £75
They should ask for the two to be done together, you'd do it for £150, 2 hours max surely.
-
i do one similer takes 45min every month
-
i do one similer takes 45min every month
I will be doing it 6 monthly but todays first clean took me 6 hours inside and out. Windows and frames were filthy.
I expect it to take me 3 hours next time (1 hour outside and upto 2 hours inside)
I Wont say how much I charged but it was a lot more than £75!!
PS No algae, just dust on th white bits and corrugated panels at the end have lots of cobwebs. nothing too major
-
you said one off,outsides only make your mind up :-\
-
Read it properly!
Window cleaning is 6 monthly, Cleaning building is a one off ::) Tme you went too your bed mate ;D
-
i did read your first says one off then other says 6monthly,just read it again,your first quote doesent say anything about 6monthly,just says building one off,just askin nothing personal :'( :'(
-
It says the building will be a one off and the windows are 6 monthly ::)
-
£1.50 m2 if they are not too rotten.