Clean It Up
UK Window Cleaning Forum => Window Cleaning Forum => Topic started by: Wrekin C S on May 16, 2008, 01:32:50 pm
-
Trying to sort out my round order with george - trying to move my clients around to different days in round order but when I move them it dosn't change in the diary view? Anyone know how to sort this out easy way?
-
I use a different system but it might be the same as george.
If you want to change all the entries for that address, you can only do it from the first date you entered it in. So you have to ge back to the begining of your schedule and change it from there. Maybe!
-
Would be good if you could just drag and drop in the diary view would save a lot of time and be a hell of a lot easier! >:(
-
Would be good if you could just drag and drop in the diary view would save a lot of time and be a hell of a lot easier! >:(
Double click the job, change the due date and hit SAVE.
Lee
-
Would be good if you could just drag and drop in the diary view would save a lot of time and be a hell of a lot easier! >:(
Double click the job, change the due date and hit SAVE.
Lee
I Have done that now mate but its a mission when you got a load to do each individually - cheers for reply
-
:'( I feel it is the only way!
I do it that way, cant think of any other way, sorry! ???