Clean It Up
UK Window Cleaning Forum => Window Cleaning Forum => Topic started by: johnny bravo on November 19, 2014, 04:53:33 pm
-
pump+ controller arived today,
wiring set-up,Pump to controller V11 Analogue controller + Shurflo 5L/Min
there are 3 wires connected onto pump, leaving 2 red connected, + 1 black open wire ,+ 1 red open wire. these two connect to Controller,
Connecting the Controller to pump
the controller has a brown which connects to the red on pump,
the Blue wire from Controller connects onto the Black
on the pump
Controller to Battery
Red to + with inline fuse fitted
Black to -
i want to make sure as even Wagga burned his out when connecting
is this coorect, thanks.
battery +} charger in now here, + tank tap,etc.
hopefully looking for good weather this weekend to set up. fingers crossed.
a bit hessitant but excited at the same time. Soon be XMAS
-
Didn't you get the instruction sheet?
-
Didn't you get the instruction sheet?
Dave,
Johnny must have missed this thread we responded to.
http://www.cleanitup.co.uk/smf/index.php?topic=190967.0
-
Link to controller guides scroll down for the analogue http://www.springltd.co/node/44
Also you may find this useful its a short Vid on calibration https://www.youtube.com/watch?v=U_6dPgfBjSI
-
great.
obviously you dont remove the 2 red wires connected into the shurflo pump itself.
setting up this weekend
-
Yes leave the red cables running from the pump base to the pump head there connect the pressure switch. You are connecting the Positive (brown or Red) and the negative Black. To the brown and black from the controller
-
thanks ian