Clean It Up
UK Window Cleaning Forum => Window Cleaning Forum => Topic started by: telfordwindowclnr on April 22, 2013, 01:16:14 pm
-
Just wondering if there are any large companies in the Loughborough area that do solar panel cleaning? One van is not enough, you will need more. We have the possibility of a job in late summer or early autumn and are making preliminary enquiries now.
Well over 80,000 panels on one site. :o
Thank you in advance. :)
Steve.
-
Steve
I can handle that if you would like!
I will email you
Rob ;D
-
Steve
I can handle that if you would like!
I will email you
Rob ;D
Thanks Rob. Fire away. :)
-
Steve
I can handle that if you would like!
I will email you
Rob ;D
Glen parva john
Thanks Rob. Fire away. :)
-
You have mail Steve - through the website!
Cheers
Rob ;D
-
Steve
I can handle that if you would like!
I will email you
Rob ;D
Glen parva john
Thanks Rob. Fire away. :)
Just spoken to Steve.
Cheers windiewasher :-)
-
Steve
I can handle that if you would like!
I will email you
Rob ;D
Glen parva john
Thanks Rob. Fire away. :)
Just spoken to Steve.
Cheers windiewasher :-)
Your welcome john
-
Thank you to those who have shown interest so far. The site is so big, we will be using multiple companies if anyone else is interested. This will not go to one company as have previous sites. :)
-
Shame
-
Did you get my email Steve or do you want a phone call?
Rob ;D
-
Dont want to stick my nose in here but maybe if your considering splitting the work into sections ie 10,000 panels per contractor
All to be done in the same week.... just a thought.. ???
-
Shame
;D
-
Did you get my email Steve or do you want a phone call?
Rob ;D
Email received Rob. Will await further contact from you. :)
-
Dont want to stick my nose in here but maybe if your considering splitting the work into sections ie 10,000 panels per contractor
All to be done in the same week.... just a thought.. ???
There is an awful lot of work on this one site. Splitting it will not be a problem. It's massive.
-
We are about 10 minutes from there mate, if you needed a hand.
-
Dont want to stick my nose in here but maybe if your considering splitting the work into sections ie 10,000 panels per contractor
All to be done in the same week.... just a thought.. ???
10,000n panel per contractor.
That's an easy 2 days for us
-
Dont want to stick my nose in here but maybe if your considering splitting the work into sections ie 10,000 panels per contractor
All to be done in the same week.... just a thought.. ???
10,000n panel per contractor.
That's an easy 2 days for us
;D I knew I should only use you Alex! You are very obviously, D'man! ;D
-
Have I introduced you to my fleet of trained monkeys
-
We are about 10 minutes from there mate, if you needed a hand.
thanks diamond and everyone else too. I'm happy that just because it was a preliminary enquiry, folks didn't fire me off into the distance saying I was wasting their time.
I will obviously be in touch when there are further developments. :)
-
Surprised dean tab ain't come forward
-
Surprised dean tab ain't come forward
What? The maestro? :)