Clean It Up
UK Window Cleaning Forum => Window Cleaning Forum => Topic started by: brianbarber on April 29, 2011, 04:38:11 pm
-
Hi guys
Been asked to quote to wash down some cladding on a factory building, the painted ribbed metal style,
Is it a case of rough time x hotly rate, or use a rate per square metre?
And would you use external tap and use tap water for scrudding and pure for rinsing?
Any help be appreciated
Mr B
-
I would use a back pack with TFR to apply to cladding and Fresh water and a pole to rinse.I would only use pure if need be for extra rinse if fresh water leaves marks. In my own experiences pure water has not been needed.
-
Mr B - i always price by time it would take to do the job - you wont need pure - as previous post spray on a
bit of TFR then WFP with water.
Darran